This plan captures our work in September. We will ship in early October. This is a 4-week iteration. Heads-up: In October we'll have our annual house-keeping iteration.
Endgame
- September 28th, 2020: Endgame begins
- October 2nd, 2020: Endgame done
The endgame details for this iteration are tracked in #107567.
Plan Items
Below is a summary of the top level plan items.
Legend of annotations:
| Mark |
Description |
| 🏃 |
work in progress |
| ✋ |
blocked task |
| 💪 |
stretch goal for this iteration |
| 🔴 |
missing issue reference |
| 🔵 |
more investigation required to remove uncertainty |
| ⚫ |
under discussion within the team |
| ⬛ |
a large work item, larger than one iteration |
Accessibility
Workbench
UX
Notebook Editor
Languages
LSP / LSIF
Debug
DAP
Investigations/reviews for:
Testing
API
Extension Contributions
Engineering
Bots
Electron
Node.js-free, sandboxed renderer
Monaco Editor
Deferred Items
This plan captures our work in September. We will ship in early October. This is a 4-week iteration. Heads-up: In October we'll have our annual house-keeping iteration.
Endgame
The endgame details for this iteration are tracked in #107567.
Plan Items
Below is a summary of the top level plan items.
Legend of annotations:
Accessibility
Workbench
Select Settings Sync Service...action as part ofSettings Sync: Configure...Include select service flow into the configure command and turn on sync wizard #104496 @sandy081UX
Notebook Editor
Languages
LSP / LSIF
Codeactions.disabled@dbaeumerDebug
DAP
Investigations/reviews for:
Testing
API
References ViewEnable to contribute content to references view #106929 @jriekenExtension Contributions
Engineering
Bots
Electron
Node.js-free, sandboxed renderer
Monaco Editor
Deferred Items