Skip to content

Latest commit

 

History

History
37 lines (27 loc) · 2.16 KB

File metadata and controls

37 lines (27 loc) · 2.16 KB

Deploy Check Results: Project Clarity MVP

Date: 2026-03-11


Build Status

  • Next.js Production Build: Pass. npm run build completed successfully with no TypeScript or ESLint errors (after fixing the Gemini .text vs .text() parsing during Code Review).
  • Dependencies: Pass. Required dependencies (lucide-react, framer-motion, @supabase/supabase-js, @google/genai, posthog-js, posthog-node) are all installed and successfully bundled.

Environment Configuration

  • Required Secrets:
    • NEXT_PUBLIC_SUPABASE_URL (Checked)
    • NEXT_PUBLIC_SUPABASE_ANON_KEY (Checked - Safe to expose client-side)
    • GEMINI_API_KEY (Checked - Kept securely server-side in /api/tasks)
    • NEXT_PUBLIC_POSTHOG_KEY (Checked - Added for Telemetry)
    • NEXT_PUBLIC_POSTHOG_HOST (Checked - Added for Telemetry)
  • Status: Pass. All variables are present and routing logic respects public vs private boundaries.

Infrastructure Readiness

  • Database: Pass. schema.sql has been executed. The tasks table is live in Supabase.
  • Server: Pass. Application is ready to be hosted on Vercel as a standard Next.js App Router deployment using serverless functions for the API routes.

Monitoring Status

  • Analytics: Pass. PostHog is implemented on both the frontend (tracking page_viewed, task_submitted, task_completed) and backend (task_categorized, ai_fallback_triggered, including ai_latency_ms).
  • Error Logging: Conditional Pass. Errors are currently caught and console.error logged. If deployed to Vercel, these will aggregate in Vercel Runtime Logs. Dedicated logging (like Sentry) is recommended for V2, but acceptable for MVP given PostHog's ai_fallback_triggered event acts as a system health proxy.

Rollback Plan

  • Application: Pass. Git-based deployments via Vercel allow instant rollbacks to previous commits.
  • Database: Pass. The schema is additive (one table: tasks). We are not mutating existing schemas, meaning rollbacks carry zero database risk.

Deployment Decision

Approve Deployment

The AI PM To-Do List MVP is safe for production deployment. All QA, review, and telemetry requirements are met.